Report for Asia Pacific Economic Cooperation (APEC) - Addressing Grid-Interconnection Issues in Order to Maximize the Utilization of New and Renewable Energy Sources. Summary Document

Summary Document. The report was funded by the Asia-Pacific Economic Cooperation Energy Working Group. Distribution technologies connect to the distribution network and while they can have a positive impact on that network, they can also have a negative impact at high penetrations if appropriate measures are not implemented. Solar photovoltaic systems (PV) are rapidly deployed at an increasing rate and are reliant on a source of energy that can fluctuate daily, hourly and even shorter periods.

Publication Category

Preparatory Phase of the Samoa Photovoltaic Electrification Programme - Survey Report Final Draft

Preparatory Phase of the Samoa Photovoltaic Electrification Programme - Survey Report Final Draft. Contract 2007 - 005 UNDP Apia, Samoa. Report is about the preparatory phase to determine the technology to be used for electrificatino of those households that remain off-grid.  Samoa has one of the highest rates of electrification in the Pacific with recent estimates showing 95%or moreof the households are connected to the national grid

Publication Category

Renewable Power Generation Cost in 2014

Renewable Power Generation Costs in 2014 is one of the most comprehensive studies yet made on the renewable energy price revolution in the power sector. Its findings are striking. Solar photovoltaic (PV) modules in 2014 cost three-quarters less than in 2009, while wind turbine prices declined by almost a third over the same period. The cost of electricity from utility-scale PV systems has fallen by around half since 2010.

Publication Category

The Age of Renewable Power - Designing National Roadmaps For a Successful Transformation

This report focuses on the role that national policy makers will play in this transformation process. The main challenge being that there is not a single roadmap or technology that provides the solution. Each country situation is unique, and local solutions need to be found to support the transition towards a renewables-based power system. It is therefore very important that policy makers work together with generators, local system operators and electricity suppliers to collectively design the future.

Publication Category

Tonga Energy Road Map (TERM) Review/Implementation Report 2010 - 2014

This Progress Report provides an introduction to the Tonga Energy Road Map (TERM) and a report on its
activities and discusses performance outcomes, way forward and lessons learned. As a result of intensive
dialogue with the Government of Tonga (GoT) and development partners, Tonga developed a ten year plan
(2010-2020), the TERM, as the guiding document for GoT actions and development partner support for the
energy sector.

Publication Category