Support to the Energy Sector in Five ACP Pacific Islands (REP-5) Federated States of Micronesia: Off-grid Solar PV Systems Installation Inspection Report Yap

Off-grid solar installation inspection report for Yap. The aim of the inspections carried out by the REP-5 Programme Management Unit (PMU) over the period of November 2008 to March 2009 in Pohnpei, Chuuk and Yap was to ensure that the supply and installation of the 161 off- grid PV systems were done. The PV systems were designed and implemented as rooftop installations at seven sites; as flat roof installations at six sites; and as ground-mounted installations at three sites. The report covers various things like identifying variation between what was included in the contract and what was supplied and installed; the quality of installation with respect to best practice; any design problems encountered; actions that need to be taken by the Contractor; actions that need to be taken by other actors in the project.

Documents

Authors
Peter Konings
Year Published
2009
Publication Category
Reports and Proceedings
Publication Thematic Areas
Renewables
Number of Pages
22
Countries covered
Federated States of Micronesia