This report was prepared by Herbert Wade, Bruce Clay and Mewang Gyeltshen. The intended outcome of this preparatory phase is a detailed grid extension and off-grid renewable energy based rural electrification program to provide the remaining non-electrified households in Samoa with 24-hour power. As part of this preparatory phase a consultancy was undertaken for household survey design, surveyor training design, survey analysis, a feasibility study and preparation of a Project Document for completion of electrification in Samoa. This document is a report of the survey component of the project.
Documents
Year Published
2008
Publication Category
Technical Publications
Publication Thematic Areas
Electricity
Number of Pages
108
Countries covered
Samoa